VETERAN-OWNED · INDEPENDENT INSURANCE BROKERAGE702-749-4369
Montridge Insurance Services, Inc.Manufacturing & Industrial InsuranceProtect Your Plant, Products, and Production
Coverage

Cyber & Industrial Control Systems Exposures

A cyber event can interrupt production without producing the physical damage required by a property policy.

Electronics assembly workers at a long production line in a Shenzhen factory.
Illustrative photography · image credit

Steve Jurvetson from Menlo Park, USA · Original photograph · CC BY 2.0. Resized and converted; responsive presentation may crop. No client relationship or endorsement implied.

For: IT, OT, plant leadership and finance teams

Where the coverage conversation starts

Manufacturers need to describe both information technology and operational technology. Business systems may manage orders, scheduling and invoicing, while industrial controls interact with physical processes. Remote vendor access, legacy equipment and production availability requirements complicate recovery planning.

Cyber underwriting should examine backups, access controls, network segmentation, incident response and restoration testing in the context of the actual plant. A questionnaire answered solely from the office IT environment may omit the controls that matter most to production.

Boundaries that deserve a closer look

Privacy response, ransomware, funds-transfer fraud, network interruption and contingent cyber interruption can have different insuring agreements and conditions. Physical damage, bodily injury and equipment damage may be excluded or addressed elsewhere. No single cyber policy should be assumed to cover all consequences of an industrial control incident.

Review waiting periods, dependent service providers, system definitions, voluntary shutdown provisions, incident reporting and consent to engage response providers. NIST operational technology guidance is a security planning resource, not evidence of insurance compliance or a guarantee that controls prevent loss.

Work through the loss before renewal

Hypothetical planning exercise: an attacker disables the scheduling server while production machinery remains physically intact. Determine whether orders can be recovered manually, how interruption costs would be measured, and which policy trigger might apply. Separately consider a scenario involving damaged equipment, since that can raise different exclusions and coordination questions.

Prepare for the conversation

Information worth bringing

  • IT and OT system inventory, remote access and critical vendors
  • Backup architecture with documented restoration tests
  • Incident response plan and plant-safe shutdown procedures
  • Cyber applications, current policies and business interruption assumptions

Discuss an appropriate exchange method before sending confidential records. This website does not collect documents.

Educational review: October 28, 2026 · Policy wording and facts control.

Related Downloadable Resources

Complimentary resources from Montridge Insurance Services.

Browse the downloadable checklist library

A clearer picture. A better conversation.

Put your next insurance
decision in context.

Bring your operation, renewal or customer contract to Montridge.

Schedule a consultation Call 702-749-4369