VETERAN-OWNED · INDEPENDENT INSURANCE BROKERAGE702-749-4369
Montridge Insurance Services, Inc.Manufacturing & Industrial InsuranceProtect Your Plant, Products, and Production
Coverage

Manufacturers Professional Liability & E&O

Customer financial loss from an alleged error may not fit bodily injury or property-damage liability coverage.

Technicians working with an automated fabric cutting and kitting machine.
Illustrative photography · image credit

Windywocket · Original photograph · CC BY-SA 4.0. Resized and converted; responsive presentation may crop. No client relationship or endorsement implied.

For: Engineering managers, contract manufacturers and owners

Where the coverage conversation starts

A manufacturer may design, specify, configure, test or advise as well as produce. Document which responsibilities the company accepts and which remain with the customer. Manufacturing to a drawing is different from guaranteeing that an entire system will meet a performance target.

Manufacturers errors and omissions or professional liability can be relevant to allegations of economic loss arising from covered errors. The precise insured services, products and wrongful acts matter. A conventional professional-services policy and a manufacturers E&O form may address different activities.

Boundaries that deserve a closer look

Contractual guarantees, liquidated damages, cost overruns, replacement of the insured’s own product and warranty obligations can raise exclusions. Insurance should not be described as a performance bond or a general promise to make a customer whole. General liability, E&O and recall arrangements need to be considered separately.

Where coverage is claims-made, retroactive dates, prior knowledge, reporting deadlines and continuity between policies can be important. A renewal premium comparison should not overlook a change in definitions or a gap in prior-acts coverage. Review defense costs, retentions and territorial provisions as well.

Work through the loss before renewal

For a practical review, choose a customer agreement with design or performance obligations. Separate claims involving injury or damage from delayed delivery, lost production and rejected output. Identify who approved specifications and changes. That record helps frame an E&O discussion without presuming the contract’s commercial obligations are insurable.

Prepare for the conversation

Information worth bringing

  • Description of design, engineering, testing and advice provided
  • Customer specifications, acceptance criteria and change controls
  • Sample contracts, warranties and limitation-of-liability clauses
  • Prior allegations, retroactive dates and existing policy forms

Discuss an appropriate exchange method before sending confidential records. This website does not collect documents.

Educational review: October 28, 2026 · Policy wording and facts control.

A clearer picture. A better conversation.

Put your next insurance
decision in context.

Bring your operation, renewal or customer contract to Montridge.

Schedule a consultation Call 702-749-4369