For: Owners, CFOs and acquisition or expansion teams
Define the transaction and the operating change
An asset purchase, entity acquisition, lease or construction project can create different responsibilities. Identify the buying and operating entities, effective dates, locations, equipment and assumed obligations. Explain whether the site is vacant, being renovated, producing trial batches or already shipping. Do not assume that an existing policy’s acquisition provision automatically covers the full transaction, all locations or every newly acquired activity. Notice requirements, limits and eligibility may apply.
Investigate the facility before relying on the schedule
Review occupancy, construction, fire protection, utilities, storage, machinery condition and environmental information. A prior use can matter even when the new operation appears straightforward. Obtain available inspection reports, property valuations, equipment records and environmental assessments. Identify unresolved recommendations and the cost or timetable for corrective work. Seller statements and a lender’s insurance checklist do not replace site-specific review by appropriate professionals.
Address the transition periods
Machinery may face transit, rigging, installation, testing and commissioning exposures before normal operations begin. Contractual responsibility can shift between seller, carrier, installer and purchaser at different points. Review who insures the property, the applicable valuation and when coverage begins and ends. Builders risk, installation coverage, cargo and operational property insurance are not interchangeable labels. Avoid gaps or duplicate assumptions by mapping each phase to a responsible party and policy.
Revisit the combined business-income exposure
An additional facility may reduce a bottleneck or create a new common dependency. Consider shared tooling, central utilities, customer approvals, enterprise systems and intercompany sales. A projected increase in revenue does not by itself establish the correct business-income limit. Model the actual ramp-up, realistic alternate production and restoration time, and discuss how the wording treats newly acquired or expanded operations.
Before closing or occupancy, confirm the authorized insurance arrangements in writing and reconcile named insureds, locations, mortgagee or loss-payee interests and contractual evidence. Specialized products, environmental history or new jurisdictions may require additional underwriting and licensing review. Record outstanding conditions and responsible owners; the insurance consultation is one part of commercial, legal, environmental and engineering due diligence, not a substitute for those disciplines.
Information worth bringing
- Transaction structure, legal entities and required effective dates
- Site assessments, protection reports and environmental history
- Machinery transfer, installation and commissioning contracts
- Projected operations, revenue, values and interplant dependencies
Discuss an appropriate exchange method before sending confidential records. This website does not collect documents.