For: Equipment manufacturers, engineering leaders and commercial managers
Follow the equipment through its delivery stages
At the factory, a machine may be insured as work in process or finished stock. During shipment, installation and testing, responsibility can shift under purchase orders and delivery terms. Identify who bears loss at each stage, who arranges transit insurance and whether testing or commissioning limitations apply. Heavy lifts, temporary storage and customer-site work should be disclosed.
A project that is physically complete may still be awaiting acceptance. Consider whether milestone payments, title transfer and customer-owned components align with the property interest being insured. Do not assume the customer’s premises policy or the transport company’s liability protection substitutes for coverage of your own interest.
Distinguish engineering error, product injury and performance
A control-system fault could be alleged to cause an injury, damage adjacent equipment or simply fail to meet promised throughput. Those allegations do not necessarily reach the same insurance policy. Review products liability alongside the definition of professional services and any manufacturers E&O protection. The cost of making your own machine perform as promised may remain a business obligation.
Sales agreements deserve review for warranties, liquidated damages, consequential loss, indemnification and acceptance criteria. Remote diagnostics and software updates can continue after shipment. Explain how safety-related changes, operating manuals and service bulletins are approved and communicated to installed customers.
Prepare evidence of the installed exposure
An equipment manufacturer should be able to describe its installed base, operating environments and service responsibilities. Underwriting may examine customer industries, export destinations, maximum unit values, quality testing and historical incidents. Explain whether components are sourced, engineered internally or modified after purchase.
For property and income planning, identify long-lead components that could prevent completion of several machines. A relatively modest controller or gearbox shortage can hold up a large order book. Assess covered-damage triggers and supplier limitations before assuming the margin on delayed projects would be recoverable.
Information worth bringing
- Product families, installed applications and highest unit values
- Sales, acceptance, installation and service contract samples
- Engineering change control and product safety documentation
- Critical purchased components and unfinished-project concentrations
Discuss an appropriate exchange method before sending confidential records. This website does not collect documents.