For: Business owners and procurement teams verifying their insurance advisor
Professional background
Robert C. Eldridge Jr. is President and Commercial & Industrial Risk Broker at Montridge Insurance Services, Inc. Owner-supplied background includes insurance licensure since 1999, TRIP and ERIS credentials, OSHA 30 Construction training, HAZWOPER 24 training and U.S. Army veteran status. These statements describe the supplied background; they do not establish a license in every jurisdiction.
Training should be understood within its scope. OSHA construction training does not certify a manufacturing plant’s compliance with general-industry standards. HAZWOPER training does not make the brokerage an environmental engineer or industrial hygienist. No governmental endorsement, insurer appointment or binding authority is implied.
Montridge Insurance Services, Inc. — Agency National Producer Number (NPN): 16902788. An NPN identifies the agency; it does not by itself establish current license status, lines of authority, insurer appointments or authority in every jurisdiction.
Verify the entity and the individual
Before a placement or other regulated insurance activity, confirm the relevant business-entity and individual licensing, lines of authority and state requirements. Use the applicable state insurance department’s verification tools. NIPR provides an NPN lookup resource, but an identifier alone is not a statement of license status or insurer authority.
A National Producer Number identifies a producer or business entity; it does not by itself confirm an active license, line of authority or insurer appointment. A certificate, designation or directory listing should not be substituted for current regulator information. Ask for transaction-specific verification where needed for procurement or compliance records.
Market access and the actual risk
A license does not mean every insurer or class of manufacturing is available. Aerospace components, chemicals, food contamination and other specialized exposures may require a separate market-access and eligibility review. Coverage, terms and pricing remain subject to underwriting and the actual policy.
If your procurement process requires evidence of professional credentials or insurance authority, identify the specific requirement in advance. The appropriate evidence may differ from a marketing biography. This educational site supports a conversation; it is not a certification that a proposed insurance program satisfies a contract or legal obligation.
Information worth bringing
- Confirm the legal entity providing the service
- Check the relevant state and line of authority
- Distinguish individual credentials from agency licensing
- Verify insurer access and authority for the specific transaction
Discuss an appropriate exchange method before sending confidential records. This website does not collect documents.
Educational review: October 28, 2026 · Policy wording and facts control.
