For: Contract manufacturers, operations leaders and procurement teams
Map who owns and controls each stage
Identify customer-supplied designs, materials, tooling and finished goods. Explain purchasing authority, subcontract processing, storage and shipping responsibilities. A plant may hold substantial property that belongs to someone else while its own balance sheet shows only labor and equipment.
Review how the contract values damaged customer property and whether liability depends on negligence or is assumed more broadly. Property-of-others coverage, bailee-type exposures and transit arrangements require evaluation against those terms. An agreement to insure another party’s property is not fulfilled simply by showing a general liability limit.
Make scope changes visible to the broker
Build-to-print assembly differs from design advice, material substitution, programming, installation and field repair. Inform the broker when the scope changes, even if the customer calls the work an extension of the original project. Different end uses may require different underwriting and exclusions.
A rejected assembly can produce rework and chargebacks without an insured injury or property-damage claim. Products liability, manufacturers E&O, recall expenses and warranty obligations should be separated. Contractual indemnity may extend beyond the policy’s liability grant; additional-insured status and certificates do not rewrite the underlying agreement.
Explain customer concentration and restart capability
A single program can occupy most of a plant’s capacity, while the customer retains the tooling and controls alternative production. Business-income planning should assess the effect of losing that cell and whether work can move elsewhere after covered damage. Customer cancellation and loss of future orders are not automatically insured.
For a useful submission, provide current contracts, revenue by program, end-use information, quality responsibilities and ownership schedules. Identify subcontractors and explain how their work is inspected and tracked. A clear responsibility matrix supports a more focused insurance review without promising that every contractual risk can be transferred.
Information worth bringing
- Responsibility matrix for design, procurement, testing and release
- Customer property values by location and production stage
- Revenue concentration and program termination provisions
- Subcontractor controls and indemnity or insurance requirements
Discuss an appropriate exchange method before sending confidential records. This website does not collect documents.
Educational review: October 28, 2026 · Policy wording and facts control.

